Preparing S/Y Stella Polaris for the winter

6-7th August 2014

kuva-2Emptying the boat. The boom, sails, the wind generator and the sprayhood are taken down. Lot of stuff from inside the boat was moved to our basement. (Sorry but the guest bedroom is booked for this winter.)

.

.

.

8th August 2014

DSCN1185No more mast. S/Y became M/S.

.

.

.

.

.

16th August 2014

Engine inspection and maintenance done.

20th August 2014

DSCN1211

Waiting to be lifted. At this stage, we had no idea from where to lift the boat, and furthermore, if she would fit into the winter rack we had for her.

.

.

.

DSCN1336

.

After three hours of sawing, drilling and adjusting both the rack and the boat to all direction, Stella Polaris is standing on dry land. Thank you harbour masters and Erkki for your help!

2 thoughts on “Preparing S/Y Stella Polaris for the winter

    • Moi H!

      Nyt vasta hoksasin viestisi!! Kiitos maininnasta, ehkäpä vastaamme kesän aikana haasteeseen blogissamme. :)

      Sanna

      Like

Leave a comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s